Environmental impact assessment of ultra-high modulus carbon fiber raw material project, public participation in the second publicity


Date:

2017-04-12

Xiaoyi Jianeng Coal Chemical Technology Development Co., Ltd. 50,000 tons/year ultra-high modulus carbon fiber raw material project environmental impact assessment Public participation in the second publicity

Xiaoyi Jianeng Coal Chemical Technology Development Co., Ltd. 50,000 tons/year ultra-high modulus carbon fiber raw material project environmental impact assessment Public participation in the second publicity

1. Brief introduction to the construction project

The site of the 50,000-ton/year ultra-high-modulus carbon fiber raw material project of Xiaoyi Jianneng Coal Chemical Technology Development Co., Ltd. is located in Wutong Coal Chemical Park, Xiaoyi City, Shanxi Province. The location of the site is conveniently located. It is close to the S223 highway on the west side, about 853m from the S223 highway, and about 560m west of the Jiexi Railway Line.The total investment of the project is 489 million yuan, and the total area is 3.06 hectares.On September 28, 2016, the Economic and Information Technology Bureau of Xiaoyi City issued [2016] Circular No. 89 with the Xiaojing Letter and agreed to carry out preliminary work on the project.

The main construction content of this project is the raw material coal tar storage device, coal tar pre-disposal device, primary thermal polymerization separation device, secondary thermal polymerization separation device, light oil disposal device, product storage device and related public auxiliary facilities, etc., It is expected to produce an annual output of 50,000 tons of ultra-high modulus carbon fiber raw materials and 120,000 tons of modified asphalt, 72,000 tons of carbon black oil and other related products.This project complies with the relevant requirements of the "Catalogue of Guidance on Industrial Structure Adjustment (2011 Edition)" (revised in 2013) and the "Interim Measures for the Filing of Enterprise Investment Projects in Shanxi Province", and complies with relevant national laws and regulations.The construction of the project can also provide a large number of employment opportunities, increase local fiscal revenue, and drive the development of related industries, which have good social and economic benefits.

2. The possible impact of construction projects on the environment and prevention and control measures

1. Air pollution prevention and control measures

Tar tube furnaces, heavy oil tube furnaces, industrial naphthalene tubes, molten salt tube furnaces, and thermal oil tube furnaces use purified coke oven gas for fuel. The flue gas after combustion is discharged through an 18m chimney. The particulate matter, SO2 and NOX in the flue gas meet the requirements of the air pollutant emission limits stipulated in Table 4 of the "Petrochemical Industry Pollutant Emission Standard" (GB31571-2015).The dust-containing exhaust gas discharged from the crystallization and drying of industrial naphthalene is discharged through a 15-meter-high chimney after passing through a cloth bag dust collector. The escaping gas in the raw material tank area, the intermediate tank area, and the product tank area is connected to the exhaust gas purification tower by pipes, and after being treated by the oil washing device, it is introduced into the heating furnace for combustion.

2. Measures for the prevention and control of wastewater pollution

Under normal working conditions, the production wastewater generated by this project is mainly tar dehydrated ammonia and phenolic water, which are collected and sent to the sewage treatment plant of Xiaoyi Jinyan Electric Power Coal Chemical Co., Ltd. For treatment; domestic wastewater is collected and sent to the sewage treatment plant of Xiaoyi Jinyan Electric Power Coal Chemical Co., Ltd. For treatment; floor flushing water and initial rainwater are sent to the project's turbid circulating water system, which is not discharged; the drainage of the circulating water system is clean wastewater and can be directly discharged.

3. Prevention and control measures for the environmental impact of noise

Choose low-noise equipment as much as possible, and take measures such as sound insulation, basic shock absorption, and muffler installation for high-noise equipment.

4. Measures for the prevention and control of solid waste pollutants

The tar residue generated by this project is sent to coal distribution for coking; the waste molecular sieve manufacturer of the air compressor station is recycled; the waste oil of the air compressor station is sent to a qualified unit for treatment; and the domestic waste is uniformly cleaned up and disposed of by the sanitation department.

5. Environmental risk prevention measures

This project proposes strict environmental risk prevention measures, and proposes practical risk prevention measures and risk emergency plans from all aspects of site selection, general plan layout and building safety prevention measures, hazardous substance storage and transportation safety prevention measures, process design safety prevention measures, various storage tank leakage accident prevention measures, and water environment risk accident prevention measures.

3. The main points of the environmental impact assessment conclusions proposed in the environmental impact report

This project meets the requirements of national, local and related industry industrial policies, complies with the local master plan, and the site is feasible. The project has formulated sound risk prevention measures and emergency plans, and adopted strict environmental protection measures. Pollutants discharged from various pollution sources can be discharged up to standard, and pollutants have little impact on regional environmental quality.

4. The method and time limit for the public to check the brief environmental impact report

Within 10 working days after the announcement of this announcement, if the public needs to know other relevant information about the project, please contact Shanxi Jinhuan Keyuan Environmental Resources Technology Co., Ltd. or Xiaoyi Jianneng Coal Chemical Technology Development Co., Ltd. To obtain a brief copy of the environmental impact report of the project and other related materials.

5. The scope and main matters for soliciting public comments

The scope of public participation in the solicitation of opinions this time is for the surrounding residents within the scope of the environmental impact assessment of the project and people from all walks of life who are concerned about the construction of the project.The main matters for solicitation are: what do you think is the current state of environmental quality in the area where you live; through the introduction, do you have any understanding of the construction content of this project; after the project is completed and put into operation, you are most worried about the environmental problems that this project may cause; after taking the environmental protection measures proposed by the EIA, whether you can accept the environmental issues of concern; what issues do you think this project should pay attention to in terms of environmental protection; what do you think the construction of this project has on the local economy, society and the environment; what are your opinions on the location of the selected site of this project; what are your opinions on the construction of this project.

6. Specific forms for soliciting public comments

The form of soliciting public comments this time intends to adopt the following three types:

(1) Directly call or send an email to the evaluation unit to put forward opinions and suggestions on the project;

(2) 10 working days after the project is publicized, a public participation symposium will be held in the local area to solicit the opinions of the public, experts and unit management departments.;

(3) Issue questionnaires to solicit public opinions on the project, and solicit relevant experts' opinions on the project in writing.

Seven, contact information:

Construction unit: Xiaoyi Jianeng Coal Chemical Technology Development Co., Ltd.

Phone: 03587856010 Email:jinyanhuanbao@163.com

Contact: Ms. Ren

EIA unit: Shanxi Jinhuan Keyuan Environmental Resources Technology Co., Ltd.

Tel: 0351-3965707 to 8014 Email:sxjhky001@163.com

Contact: Mr. Tian Address: 7th Floor, Zhejiang Building, Wangjing Road, Wanbailin District, Taiyuan City, Shanxi Province

8. The start and end time for public comments

Within 10 working days after the announcement of this announcement, the public can submit written opinions to the construction unit and the EIA unit of the project through letters, faxes, and e-mail.