Announcement of the first EIA of the ultra-high modulus carbon fiber raw material project
Date:
2017-02-20
The site of the 50,000-ton/year ultra-high-modulus carbon fiber raw material project of Xiaoyi Jianneng Coal Chemical Technology Development Co., Ltd. is located in Wutong Coal Chemical Park, Xiaoyi City, Shanxi Province. The location of the site is conveniently located.
A public announcement on the environmental impact assessment of the “50,000 tons/year ultra-high modulus carbon fiber raw material project of Xiaoyi Jianneng Coal Chemical Technology Development Co., Ltd.”
1. The name and summary of the construction project
The site of the 50,000-ton/year ultra-high-modulus carbon fiber raw material project of Xiaoyi Jianneng Coal Chemical Technology Development Co., Ltd. is located in Wutong Coal Chemical Park, Xiaoyi City, Shanxi Province. The location of the site is conveniently located. It is close to the S223 highway on the west side, about 853m from the S223 highway, and about 560m west of the Jiexi Railway Line.The total investment of the project is 489 million yuan.On September 28, 2016, the Xiaoyi Municipal Bureau of Economic and Information Technology issued Circular [2016] No. 89 with the Xiaojing Letter for the record of the project. The main construction content of this project is the raw material coal tar inventory device, coal tar pre-disposal device, primary heat polymerization separation device, secondary heat polymerization separation device, light oil disposal device, product storage device and related public auxiliary facilities.It has formed an estimated annual output of 50,000 tons of ultra-high modulus carbon fiber raw materials, 120,000 tons of modified asphalt, 72,000 tons of carbon black oil and other related by-products production capacity. This project complies with the relevant requirements of the "Catalogue of Guidance on Industrial Structure Adjustment (2011 Edition)" (revised in 2013) and the "Interim Measures for the Filing of Enterprise Investment Projects in Shanxi Province", and complies with relevant national laws and regulations.
2. The name and contact information of the construction unit of the construction project
Construction unit: Xiaoyi Jianeng Coal Chemical Technology Development Co., Ltd.
Address: Wutong Coal Chemical Park, Xiaoyi City, Shanxi Province
Contact number: 03587856010
Contact: Ms. Ren Email:jinyanhuanbao@163.com
3. The name and contact information of the environmental impact assessment agency that undertakes the evaluation work
EIA unit: Shanxi Jinhuan Keyuan Environmental Resources Technology Co., Ltd.
Address: 7th Floor, Zhejiang Building, Wangjing Road, Wanbailin District, Taiyuan City, Shanxi Province
Contact number: 0351-3965707 to 8014
Contact: Mr. Tian Email:sxjhky001@163.com
4. Working procedures and main work content of environmental impact assessment
EIA work procedures: commissioned by the enterprise-on-site survey-project research-preparation of EIA report-report to the competent environmental protection department-expert review-approval by the competent environmental protection department. The main work content of the EIA: overview of the construction project, overview of the natural and social environment of the area where the project is located, project engineering analysis, project environmental impact analysis (including environmental air, water environment, sound environment, solid waste, ecology, etc.), environmental risk assessment, total control, environmental management and monitoring plan, environmental protection countermeasures, environmental impact and economic profit and loss analysis, site location analysis, summary theory.
5. Main matters for soliciting public comments
In accordance with the provisions and requirements of the "Interim Measures for Public Participation in Environmental Impact Assessment" No. 28 of 2006 issued by the former State Environmental Protection Administration, the environmental assessment of this project requires public participation, and requires the construction unit or the evaluation unit to adopt a method that is easy for the public to know and disclose information about the environmental impact assessment to the public. This information publicity is to let the public know the name, scale and construction location of the construction project, inform the public of the relevant information of the project construction unit and the project evaluation unit, and at the same time let the general public from the perspective of environmental protection, according to the project construction situation, objectively, impartially and truthfully make suggestions for the construction of this project, and briefly explain the reasons.
6. The main ways for the public to submit opinions
The public can reflect relevant opinions or suggestions to the construction unit by telephone, fax, e-mail, etc. The construction unit will pay full attention to the opinions of the public during the evaluation process, and will then hold public participation seminars, individual interviews, and distribute public participation questionnaires to collect relevant suggestions and opinions in various forms to provide a public basis for scientific evaluation.
Key words:
Jinyan Group Jinyan Energy
Related News